Laserfiche WebLink
PAPERWORK REDUCTION ACT <br /> The public reporting and record keeping burden for this collection of information is estimated to average 49 hours per response for a Class I <br /> hazardous facility, and 47 hours per response for a Class I non-hazardous facility. Burden means the total time, effort, or financial resource <br /> expended by persons to generate,maintain,retain,or disclose or provide information to or for a Federal Agency.This includesthe time needed <br /> to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying <br /> information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any <br /> previously applicable instructions and requirements;train personnel to be able to respond to the collection of information;search data sources; <br /> complete and review the collection of information,and, transmit or otherwise disclose the information. An agency may not conduct or sponsor, <br /> and a person is not required to respond to,a collection of information unless it displays a currently valid OMB control number.Send comments <br /> on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing <br /> respondent burden,including the use of automated collection techniquesto Director,Collection Strategies Division,U.S.Environmental Protection <br /> Agency (2822), 1200 Pennsylvania Ave., NW.,Washington,D.C. 20460.Include the OMB control number in any correspondence. Do not send <br /> the completed forms to this address. <br /> Attachments to be submitted with the Completion report: <br /> I.Geologic Information 4. Provide data on centralizers to include number,type <br /> and depth. <br /> 1. Lithology and Stratigraphy <br /> 5. Provide data on bottom hole completions. <br /> A. Provide a geologic description of the rock units pene- <br /> trated by name,age,depth,thickness,and lithology of 6. Provide data on well stimulation used. <br /> each rock unit penetrated. <br /> III.Description of Surface Equipment <br /> B. Provide a description of the injection unit. <br /> 1. Provide data and a sketch of holding tanks,flow lines, <br /> (1)Name filters, and injection pump. <br /> (2)Depth(drilled) <br /> (3)Thickness IV.Monitoring Systems <br /> (4)Formation fluid pressure <br /> (5)Age of unit 1. Provide data on recording and nonrecording injection <br /> (6)Porosity(avg.) pressure gauges,casing-tubing annulus pressure <br /> (7)Permeability gauges, injection rate meters,temperature meters,and <br /> (8)Bottom hole temperature other meters or gauges. <br /> (9)Lithology <br /> (10)Bottom hold pressure 2. Provide data on constructed monitor wells such as <br /> (11)Fracture pressure location,depth,casing diameter,method of cementing, <br /> etc. <br /> C. Provide chemical characteristics of formation fluid <br /> (attach chemical analysis). V.Logging and Testing Results <br /> D. Provide a description of freshwater aquifers. Provide a descriptive report interpreting the results of <br /> geophysical logs and other tests. Include a description <br /> (1)Depth to base of fresh water(less than 10,000 mg/I and data on deviation checks run during drilling. <br /> TDS). <br /> (2)Provide a geologic description of aquifer units with VI.Provide an as-built diagrammatic sketch of the injec- <br /> name,age,depth,thickness, lithology,and average total tion well(s)showing casing,cement,tubing, packer,etc., <br /> dissolved solids. with proper setting depths.The sketch should include <br /> well head and gauges. <br /> II.Well Design and Construction <br /> VII.Provide data demonstrating mechanical integrity <br /> 1. Provide data on surface, intermediate,and long string pursuant to 40 CFR 146.08. <br /> casing and tubing. Data must include material,size, <br /> weight,grade,and depth set. VIII.Report on the compatibility of injected wastes with <br /> fluids and minerals in both the injection zone and the <br /> 2 Provide data on the well cement, such as type/class, confining zone. <br /> additives, amount,and method of emplacement. <br /> IX.Report the status of corrective action on defective <br /> 3. Provide packer data on the packer(if used)such as wells in the area of review. <br /> type, name and model,setting depth,and type of annular <br /> fluid used. X.Include the anticipated maximum pressure and flow <br /> rate at which injection will operate. <br /> EPA Form 7520-9 Reverse <br />