My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0543397
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:21:23 AM
Creation date
2/10/2020 9:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543397
PE
2965
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUIREMENTS <br /> UIC PRESSURE FALLOFF TESTING GUIDELINE <br /> Third Revision <br /> August 8, 2002 <br /> 1.0 Background <br /> Region 9 has adopted the Region 6 UIC Pressure Falloff Testing Guideline requirements for <br /> monitoring Class 1 Non Hazardous waste disposal wells. Under 40 CFR 146.13(d)(1), operators <br /> are required annually to monitor the pressure buildup in the injection zone, including at a <br /> minimum, a shut down of the well for a time sufficient to conduct a valid observation of the <br /> pressure falloff curve. <br /> All of the following parameters (Test, Period, Analysis) are critical for <br /> evaluation of technical adequacy of UIC permits: <br /> A falloff test is a pressure transient test that consists of shutting in an injection well and <br /> measuring the pressure falloff. The falloff period is a replay of the injection preceding it; <br /> consequently, it is impacted by the magnitude, length, and rate fluctuations of the injection <br /> period. Falloff testing analysis provides transmissibility, skin factor, and well flowing and <br /> static pressures. <br /> 2.0 Purpose of Guideline <br /> This guideline has been adopted by the Region 9 office of the Evironmental Protection Agency <br /> (EPA)to assist operators in planning and conducting the falloff test and preparing the <br /> annual monitoring report. <br /> Falloff tests provide reservoir pressure data and characterize both the injection interval reservoir <br /> and the completion condition of the injection well. Both the reservoir parameters and pressure <br /> data are necessary for UIC permit demonstrations. Additionally, a valid falloff test is a <br /> monitoring requirement under 40 CFR Part 146 for all Class I injection wells. <br /> The ultimate responsibility of conducting a valid falloff test is the task of the operator. Operators <br /> should QA/QC the pressure data and test results to confirm that the results "make sense"prior to <br /> submission of the report to the EPA for review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.