My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0543397
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:21:23 AM
Creation date
2/10/2020 9:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543397
PE
2965
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
files included and any necessary explanations of the data. A separate file containing any <br /> edited data used in the analysis can be submitted as an additional file. <br /> 10. Tabular summary of the injection rate or rates preceding the falloff test. At a <br /> minimum, rate information for 48 hours prior to the falloff or for a time equal to twice the <br /> time of the falloff test is recommended. If the rates varied and the rate information is <br /> greater than 10 entries, the rate data should be submitted electronically as well as a hard <br /> copy of the rates for the report. Including a rate vs time plot is also a good way to <br /> illustrate the magnitude and number of rate changes prior to the falloff test. <br /> 11. Rate information from any offset wells completed in the same interval. At a <br /> minimum,the injection rate data for the 48 hours preceding the falloff test should be <br /> included in a tabular and electronic format. Adding a rate vs time plot is also helpful to <br /> illustrate the rate changes. <br /> 12. Hard copy of the time and pressure data analyzed in the report. <br /> 13. Pressure gauge information: (See Appendix, page A-1 for more information on <br /> pressure gauges) <br /> • List all the gauges utilized to test the well <br /> • Depth of each gauge <br /> • Manufacturer and type of gauge. Include the full range of the gauge. <br /> • Resolution and accuracy of the gauge as a%of full range. <br /> • Calibration certificate and manufacturer's recommended frequency of calibration <br /> 14. General test information: <br /> • Date of the test <br /> • Time synchronization: A specific time and date should be synchronized to an <br /> equivalent time in each pressure file submitted. Time synchronization should also <br /> be provided for the rate(s) of the test well and any offset wells. <br /> • Location of the shut-in valve (e.g., note if at the wellhead or number of feet from <br /> the wellhead) <br /> 15. Reservoir parameters (determination): <br /> • Formation fluid viscosity, µf cp (direct measurement or correlation) <br /> • Porosity, (� fraction(well log correlation or core data) <br /> • Total compressibility, ct psi"' (correlations, core measurement, or well test) <br /> • Formation volume factor, rvb/stb (correlations, usually assumed 1 for water) <br /> • Initial formation reservoir pressure - See Appendix,page A-1 <br /> • Date reservoir pressure was last stabilized (injection history) <br /> • Justified interval thickness, h ft- See Appendix, page A-15 <br /> 16. Waste plume: <br /> • Cumulative injection volume into the completed interval <br /> • Calculated radial distance to the waste front, rwaste ft <br /> • Average historical waste fluid viscosity, if used in the analysis, cp <br /> 17. Injection period: <br /> • Time of injection period <br /> • Type of test fluid <br /> • Type of pump used for the test (e.g.,plant or pump truck) <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.