My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:31:40 PM
Creation date
2/10/2020 11:37:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" - 9 - <br /> Module via a conduit dedicated to TLS Console low-voltage sensors. Figure 2113-7 shows an <br /> ISD Vapor Pressure Sensor illustration. Figures 2113-10 and 26-11 show the dispenser <br /> installation configuration. Figure 26-12 shows the vapor vent stack installation configuration. <br /> Dispenser Interface Module (DIM) <br /> Existing Dispenser Interface Modules or DIM communication cards are used to interface to the <br /> dispenser Point Of Sale (POS) or controller system to gather fuel transaction data. The ISD <br /> Operability Test Procedure provided in Exhibit 10 and Exhibit 17 and in Section 4 of the Veeder- <br /> Root ISD Install, Setup and Operation Manual for VST ECS Membrane Processors can be used <br /> to verify the proper selection and setup of the Dispenser Interface Module. See Figure 26-8 for <br /> a typical Dispenser Interface Module Illustration. <br /> Tank Inventory Probe Sensor <br /> Existing Tank Inventory Probe sensors (one per tank) are used to measure the amount of vapor <br /> space in the Underground Storage Tanks (USTs). The ISD Operability Test Procedure can be <br /> used to verify the proper selection and setup of the Tank Inventory Probes. See Figure 2113-9 <br /> for a typical Tank Inventory Probe Sensor. <br /> Shutdown Control <br /> The TLS Console must be wired per the Veeder-Root ISD Install, Setup and Operation <br /> Manual 577013-937 Rev. D of the ARB Approved Installation, Operation and Maintenance <br /> Manual for the VST Phase Il EVR System Including the Veeder-Roof ISD System such that <br /> it shall automatically prohibit the dispensing of individual dispensers or through shutdown of all <br /> the gasoline turbine pumps during a CP-201 ISD failure alarm. It shall also automatically <br /> prohibit the dispensing of all dispensers during a TLS Console ISD system power loss. <br /> TLS Console Modules <br /> The ISD Operability Test Procedure in Exhibit 10 and Exhibit 17 and in section 12 of ARB <br /> Approved IOM Manual(Section 4 of the Veeder-Root ISD Install, Setup, and Operation Manual <br /> for VST ECS Membrane Processors)shall be used to verify the proper selection and setup of the <br /> TLS Console Modules. <br /> Training Program <br /> All Veeder-Root contractors must successfully complete the applicable Veeder-Root training <br /> program before they can install, startup, and service TLS Console equipment. Contractors must <br /> have up-to-date Level 1 certification to install the TLS Console ISD system. Contractors must <br /> have an up-to-date Level 2, 3 or 4 certification and the ISD certification to startup and service <br /> the ISD system. The schedule, fee and registration information for the Authorized Service <br /> Contractor (ASC) training program can be found at http://www.veeder.com. <br /> To confirm TLS or ISD training a regulator should send an email to technicaltraining(a-)gilbarco.com <br /> with the name (and company) of the ASC to obtain verification of the ASC TLS/ISD training status <br /> or call 800-997-7725 and press "'' to get to the Veeder-Root menu and "*" again to speak to a <br /> representative. <br /> VST Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2 - VR-204-H <br />
The URL can be used to link to this page
Your browser does not support the video tag.