Laserfiche WebLink
A <br /> SAN JOAgUIiN COUNTYzPARTMENT <br /> ENVIRONMENTAL HEALTH 1a1DE <br /> lPornia 95202029 <br /> v ord h uni iii. t I <br /> 600 East Main Stre2t0.8>x68-34-3433 web' �"' • �•�— <br /> hone'(209)468-3420 Fax:( page: 3 of 3 i <br /> rgiep Date: 08/10/10 <br /> CONTINUATION FORM Pro ram: UST <br /> FF p4 P <br /> Faci{ity Address: 7700 Moreland Street, Stockton <br /> SLAI <br /> UMMAS Y�Mu��R� iT�Oto NS m <br /> cuss I.CLAS <br /> ection and Monitoring SYSter<'certification <br /> Routine UST insp S7191 vents vacuum <br /> alarms were not found on site- ^87 line vacuum sensor <br /> 7, Maintenance records for the following _ <br /> 12-5-09, 2�8-10 and 2-3-10• on site for at least 3�D years- <br /> sensor 1 These records shall be kept <br /> sensor went into communication alarm o <br /> went into communication alarm on a maintenance records on site and submit copies to the <br /> Immediately locate and maintain t previous <br /> month and check that <br /> September 10, 2010. <br /> d 4-10 designated operator monthly <br /> designated operator failed to do <br /> �e Z 10'112 09 and <br /> for vacuum sensor went into <br /> 23c.The rp rialely o 87191 vents vac <br /> they were responded to aPP p alarms include: S4 - rotor shall review <br /> The missing 10. S1 - 87 line vacuum sensor went into <br /> inspection repo+�s on 12.5-09, 2-8-10 and 2-3- inspection, the designated ohe nded to <br /> cornmunication alarm the monthly sponse to any <br /> communication alarm on 4-23-10•month, heck that each alarm was o��ene� ae po s <br /> c for the prev►ouwith do in monthly inspections at this <br /> the alarm history of the alarm history rotors perform 9 <br /> appropriately, and attach a copy orfs• <br /> monthly report. Ensure that designated operators <br /> alarms to the required information on thereports. of the UST system <br /> facility are including all of the req <br /> The interstitial space primary Or <br /> _ piesel line high liquid sensor failed when tested. into the environment• <br /> The S5 substance is released <br /> 47. <br /> ed, under constant vacuum such that a breach in t ee lace the failed <br /> fore the ha�ardou certified contractor replace <br /> within one <br /> shall be maintained, n design licensed, trained, and Ge ossibility <br /> secondary Coll is detea properly if applicable) and obtain a here is a p <br /> b having P Hent(LG 113-x listed, laced immediately, <br /> Correct <br /> immediately ofnctiorial compo component can't be rep uts. I <br /> component with a If the failed comp the EHD tO prevent fuel inP <br /> business day from the EHD be red tagged by l <br /> that the Diesel UST systen'' may <br /> m Bance Certification form with a statement of how <br /> Notes_ September 10.2010. <br /> Complete and submit a copy <br /> of the Return t odeg documentation, by <br /> each violation was corrected: including <br /> Supp <br /> NOUr�Y RAS(E115)- <br /> D AT THe cu�� Y RATE• <br /> TED Y+rtH pprilMa TO GaMPLx er rFM�,aove NOTED DATE6 WfU 6fl g1�1 E N i RoURL <br /> �N AT ANY TIME Al EHD'S CU <br /> Title: <br /> Ai,�EHD srnFp��^��' O REINSPi=� <br /> T 5 ACI IS SUBJECT T � alved.5 <br /> cogrINIWMON FOR%1 <br /> EHOIn or. <br /> R'V <br /> EHD 29-02-00 <br /> pt;�01l10 <br />