Laserfiche WebLink
e <br /> Multi-,Syminstallatiff instructions <br /> DPM �` Sueline Medium Rttirxjs <br /> � M E;lt�B E R <br /> ThisidtprovidestheMulti-Syncll?pairforapplicationswherethepipeiscomingthruthe <br /> I-www sump wall straight or at an angle. <br /> WARNING Prepare all surfaces to be bonded prior to completing installation steps below. <br /> MSZ BLGA-xx Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Page S lois Kit amliesfor repairing llueline Medium Flttinps <br /> General irmfit tionsfor. ClF4NIN(k dray all surfaces to be bonded with DBCCleaner and allow to air dry or wipe excess with a dean dry <br /> doth- 9afaoesmust be dry before applying bonder. <br /> Gttrteral Instru tionsfor. BONDINGTO POLYSUMPSORIlHEUI4SSSUMP3 Clean,sand and rough up sump surfaces, Clean fitting and <br /> cup 211X717EorDW11 between Bonding Fang&sump wall. <br /> 3I@�1: I wwwe Old Bad <br /> STEP 2: Clean all Fbpair Qxnponents STEP 3: Place&Dry Ht Cliff Rtrg,9eewe&Insert <br /> • Rzmovedanps an all repair componentswith DBC • Wrack the split cuff ring over the old fitting <br /> • Oil away old boot to installation • Wrack the split insert over the pipe <br /> • Clean&sand fdtirg • Wrack the split sleeve over the pipe&up to the <br /> p� flit bonding ring with the fill port up <br /> uff seem <br /> ng <br /> - nsc <br /> Fme[ltlfClrtsert flit Multi-,'jnc <br /> Insert Fbducer <br /> n_ --. u 1___Y;ro A Q• a STEP& Install The Some,Q�f R &Insert <br /> n9 SPS 8:Install&Bord Eooerrtric Insert&M <br /> t alit Sync <br /> • Apply 21p-Tde to the outer surface of the Fipducer Mdk Together <br /> insert and fully seat inside of cuff - Rack Fmerdric Insert around the pipe <br /> • Apply Zp-Tde to the inner surface of the cuff Wrack Mult i�mc Fbdueer around the pipe <br /> . ring and slide all the way onto the cuff Apply Zip-Tde to split area on Eccentric Insert,press <br /> • Position the sleeve with the fill port at the top ends togsther&clamp <br /> • Once you have the sleeve lined upcorrect ty, Apply Zp-Tdetosplit area onMulti4*ncReducer, <br /> 1.Apply a bead of Op-Tde all around the press ends together&damp <br /> 57EP4: 8ondffiseve,Q f FirgB Insert outer surface of the cuff ring <br /> • Apply Zip Tde to split cuff ring. Use 1 of 2.Side sleeve over cuff ring&snap in place <br /> the damps to hold in place while curing (fill port at top) - <br /> • Apply Zp-Tde to the split Insert and use 1 3.33t the(lamp the around the sleeve& <br /> of the danpsto hold in place while overthe cuff ringand tighten its(-6TrV <br /> curing. <br /> • Apply Zp Tile to the split sleeve and use 2 <br /> damps to hold in place while curing. <br /> - Leave.these damps in place for approx 30 <br /> minutesfor acing before proeeedngto <br /> the Mid step <br /> s <br />