Laserfiche WebLink
SAFETY COMPLETION REPORT <br /> C <br /> This report must be submitted to the Operating Unit Health and Safety Officer upon <br /> completion of the project. <br /> PROJECT NAME: <br /> PROJECT NUMBER: <br /> 1. EVALUATION OF HEALTH AND SAFETY PLAN <br /> a. Was the plan adequate? <br /> b. Did the plan adequately anticipate chemical and physical hazards actually present <br /> at the site? <br /> c. What situations were discovered that were not anticipated in the health and safety <br /> plan? <br /> d. How were these situations handled? <br /> e. Was the recommended PPE (such as gloves, respirators, eye, face and skin <br /> protection) adequate to protect employees from chemical exposures? <br /> f. Comments <br />