Laserfiche WebLink
05 August 2015 <br /> AGE Project No. 06-1463 <br /> Page 5of5 <br /> groundwater at the site will reach water quality objectives as required by the SJCEHD <br /> directive letter dating 14 April 2015 (Appendix D). <br /> Linear trend analysis of TPH-g concentrations versus time in wells MW-1, MW-2, MW-3, <br /> MW-6, MW-813, BW-8C, MW-8D, MW-9A, MW-9B, MW-9C and MW-9D show a clear <br /> relationship of downward trending concentrations versus time. Based on trend graph <br /> analysis, TPH-g concentrations in the locations of the monitoring well listed above <br /> (impacted wells) will reach near to non-detectable levels between 2015 and 2024. Trend <br /> graphs are presented in Appendix D. <br /> If you have any questions or require further information, please contact our office at <br /> (209) 467-1006. <br /> Sincerely, <br /> QPS\ONAL GF <br /> Advanced GeoEnvironmental, Inc QQoNW M/Ccs <br /> No.8574 <br /> 0 <br /> Daniel J. Villanueva Brian W. Millman <br /> Project Geologist Senior Project Geologist s'g7FaFCAOFOe��P <br /> California Professional Geologist 0.8574 <br /> cc: Mr. Swaran Chouhan, Super Center Mart <br /> Advanced GeoEnvironmental,Inc. <br />