Laserfiche WebLink
`d15E ASSESSMENT WMK PLAN <br /> 1 Shell Station 420 W. Kettleman Lane <br /> :odi, California <br /> Aegis Project No. 89-013 <br /> page 15 <br /> 5.0 SCHEDULE <br /> Aegis will proceed with the work outlined in this plan when <br /> approval is obtained. A drilling creta will be mobilized to drill <br /> the proposed borings within two weeks of approval of this plan. <br /> - Laboratory analyses of soil samples will require one week. . A <br /> summary report of the assessment results including information on <br /> subsurface soils, hydrologic conditions, conclusions, and <br /> recommendations will" be prepared within a month after laboratory <br /> F results are received. <br /> I Y. <br /> _ r - <br /> :L <br /> f <br /> i <br /> - <br /> < <br />