Laserfiche WebLink
(a) Mailing List — Proponent to develop (or update) with DTSC review and <br /> approval; <br /> (b) Start Work Notification — DTSC will develop with distribution by the Proponent; <br /> (c) Fact sheet/Flyer with post-sampling results — DTSC will develop with <br /> distribution by Proponent; <br /> (d) Public Meeting — optional based upon post-sampling results. If required this <br /> will be a cooperative effort between DTSC and the Proponent. <br /> TASK 3. Quality Assurance/Quality Control (QA/QC) Plan. All sampling and analysis <br /> conducted by the Proponent under this Agreement shall be performed in accordance with <br /> a QA/QC Plan submitted by the Proponent. The QA/QC Plan will describe: <br /> (a) the procedures for the collection, identification, preservation and transport of <br /> samples; <br /> (b) the calibration and maintenance of instruments; <br /> (c) the processing, verification, storage and reporting of data, including chain of <br /> custody procedures and identification of qualified person(s) conducting the <br /> sampling and of a laboratory certified or approved by DTSC pursuant to Health <br /> and Safety Code section 25198; and <br /> (d) how the data obtained pursuant to this Agreement will be managed and <br /> preserved in accordance with the Preservation of Documentation section of <br /> this Agreement. <br />