My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
504
>
2900 - Site Mitigation Program
>
PR0521982
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 6:42:45 PM
Creation date
2/10/2020 4:15:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521982
PE
2960
FACILITY_ID
FA0014958
FACILITY_NAME
STOCKTON GROUP
STREET_NUMBER
504
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13737003
CURRENT_STATUS
01
SITE_LOCATION
504 WEBER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> ' Clayton <br /> Gi0U1 VICFS <br /> Section Page <br /> 1.0 INTRODUCTION................................................_....................................................1 <br /> 2.0 BACKGROUND.........................................................................................................1 <br /> 2.1 SITE DESCRIPTION...................................................................................................1 <br /> 2.2 SITE GEOLOGY........................................................................................._...............1 <br /> 2.3 SITE HISTORY...........................................................................................................2 <br /> 3.0 PREVIOUS SITE INVESTIGATIONS ...................................................................2 <br /> 4.0 SCOPE OF WORK....................................................................................................4 <br /> 5.0 MONITORING WELL INSTALLATION WORKPLAN.....................................5 <br /> 5.1.1 Pre-Field Activities...............................................................................................5 <br /> 5.1.2 Monitoring Well Construction..............................................................................6 <br /> 5.1.3 Soil Sampling and Analysis..................................................................................6 <br /> 5.1.4 Monitoring Well Development.............................................................................7 <br /> 5.1.5 Monitoring Well Survey.......................................................................................8 <br /> 5.1.6 Monitoring Well Sounding and Sampling............................................................8 <br /> 6.0 REPORTING..............................................................................................................9 <br /> Figures <br /> 1 Regional Map <br /> 2 Site Location Map <br /> 3 Former Sampling Locations <br /> 4 TPHg Concentrations in Groundwater,Third Quarter 2002 <br /> 5 TPHd Concentrations in Groundwater, Third Quarter 2002 <br /> 6 TPHmo Concentrations in Groundwater, Third Quarter 2002 <br /> 7 Proposed Monitoring Well Locations <br /> Appendix <br /> Appendix A—Historical Analytical Data <br /> PL\SAFS\PROI CTS\200303429 Unwal Llnwin and Web wkplN@c02)\wkpinldmpi).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.