Laserfiche WebLink
%, CAM B R I A <br /> ANTICIPATED THIRD QUARTER 2002 ACTIVITIES <br /> Monthly sampling was voluntarily implemented at this site following the September 2001 <br /> sampling event and continued through May 2002 Blaine will now sample the site quarterly and <br /> coordinate the event with the former Chevron station located at 301 West Kettleman Lane <br /> according to the existing sampling schedule Blaine will gauge and sample all site wells and <br /> tabulate the data Cambria will prepare a groundwater monitoring report <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Cambria recommended that this site be reviewed for case closure in our First Quarter 2002 <br /> Groundwater Monitoring Report and Closure Request dated May 17, 2002 The groundwater <br /> analytical results from this quarter further demonstrate that case closure is warranted As we <br /> discussed during our July 2,2002 telephone conversation, based on these results, we request that <br /> San Joaquin County Environmental Health Department recommend case closure to the Regional <br /> Water Quality Control Board <br /> 0, CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (707)933-2368 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Aubrey K Cool <br /> Project Geologist <br /> iKED G�G� <br /> +�1 W O <br /> Joe W Neely,RG <br /> Senior Project Geologist No 6927 <br /> RG 6927 <br /> ��0�CALIC-O�`P <br /> 0 <br /> 1346 2 <br />