Laserfiche WebLink
IVELL AIONTTORING D.AT.A. SHEET <br /> Project ## Client- <br /> Sampler: Start Date: d 7401 <br /> Well I DWell Diameter 2 3 4 6 8 <br /> Total Well Depth (09- t6l Depth to Water: (,?(� • �� <br /> Before• After: Before• After: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to- PVC f Grade 1D.O. Meter(if req'd): YSI EACH <br /> Purge Method: Sampling Method: 114ailer <br /> iler Waterra DtspOsable Bailer4.,B,a <br /> Disposable Batter Pei istaltic Extraction Port <br /> Middleburg Exh actinn Pump Dedicated Tubing <br /> ,, lechtc Submersible Other Other. <br /> tWC11 Ownggr MUIURIler Well Dlmn er -Muffialler <br /> 1" 004 4" 065 <br /> (Gass)X -- Gals z" 0 16 6" 147 <br /> 1 Case Volume Spec' ed Volumes Calculated Volume 3" 0.31 other rndlusI*0163 <br /> Time Temp (T) pH Coad Turbidity Gads Removed Observations <br /> -7-2-,`o -7- Iz— <br /> • -7 . 0 CZE{ 2D0 <br /> id 1. 0 7 "a <br /> V, dfL­, VV_f� <br /> !gyp <br /> -Zoo <br /> t - 400 <br /> Did well deivater? Yes KNo") Gallons actually evacuated: <br /> Sampling Time- &pqo 0 Sampling Date: � G/ <br /> Sample I D : Laboratory r,i <br /> Analyzed f r: TI7H-c aT>r MTBE TPH-D Other: 2ha <br /> Equipment B lank I D.: Ttmc <br /> Duplicate I D <br /> Analyzed fol: TPN-G BTEX 1,9TBE TPH-D Other: <br /> D.O (if leq'd): Pie-purge "Ig/l. Post-purge <br /> ORP (if re-qd)- Dre-purge: MV Post-purge.', UTV <br />