Laserfiche WebLink
Fj <br /> 5.0 Schedule <br /> F; The utility survey was completed the week of May 20, 2002 and the drilling will commence <br /> pending Caltrans and Regulatory approval of the Workplan and health and safety plan. It is <br /> i r anticipated that the drilling and excavation can be completed in one day. Samples will be <br /> submitted to the laboratory within 48 hours of collection. The laboratory analyses will be <br /> Fconducted on a normal turn around basis. Following receipt of all analytical data, a draft report <br /> documenting the findings of the investigation will be submitted. <br /> I <br /> Ft <br /> F, <br /> F1 <br /> •IMCRFP IICOMMOM,a,DP2002I PRJNJ818IW51U,2a6.d. <br /> 5-1 <br />