S E C O R <br /> • 2003 Feasibility Study Report and Site Assessment Work Plan <br /> July 18, 2003 <br /> Page 23 <br /> 9.0 ESTIMATES PROJECT SCHEDULE FOR EACH ALTERNATIVE <br /> The estimated project schedule to fully implement each remedial alternative is described below. <br /> 9.1 Groundwater Barrier <br /> Task Schedule weeks Cumulative weeks <br /> Feasibility S udy Approval 4 4 <br /> Design 4 8 <br /> Log istics/Permittin /Utilities 4 12 <br /> Competitive Bid 4 16 <br /> Construction 4 22 <br /> 9.2 Hydraulic Control Line <br /> Task Schedule weeks Cumulative weeks <br /> Feasibility Study Approval 4 4 <br /> Design 8 12 <br /> • <br /> Log istics/Permittin /Utilities 8 20 <br /> Competitive Bid 4 24 <br /> Construction 6 30 <br /> 9.3 Combination of Groundwater Barrier and Hydraulic Control Line <br /> Task Schedule weeks CumulativeEweeEksfl <br /> FeasibilityStud Approval 4 4 <br /> Design 8 12 <br /> Log istics/Permittin /Utilities 8 20 <br /> Competitive Bid 4 24 <br /> Construction 6 30 <br /> 9.4 Groundwater oxygenation System <br /> Task Schedule weeks Cumulative weeks <br /> Feasibility Study Approval 4 4 <br /> Design 6 10 <br /> Log istics/Permittin /Utilities 6 16 <br /> Competitive Bid 4 20 <br /> Construction 4 24 <br /> • <br /> I:\Chevron\1001621\REPORTS\2003\2003FS\FS 2003 revD.doc <br />