My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUBBARD
>
4343
>
2900 - Site Mitigation Program
>
PR0545291
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 7:33:51 PM
Creation date
2/10/2020 4:50:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545291
PE
2952
FACILITY_ID
FA0005122
FACILITY_NAME
EL DORADO INVESTMENTS
STREET_NUMBER
4343
Direction
N
STREET_NAME
HUBBARD
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
4343 N HUBBARD AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C � <br /> SITE SECURITY <br /> Access during all on-site activities will be restricted to authorized personnel. All personnel and <br /> authorized visitors must contact the,Safety Coordinator/Project Manager prior to entering and <br /> exiting the exclusion area. <br /> L <br /> RECORD KEEPING <br /> All site safety records pertaining to the site characterization study will be maintained by the <br /> LSafety Coordinator/Project Manager throughout the project.. <br /> AIR MONITORING <br /> The Safety Coordinator/Project Manager will conduct periodic air monitoring, using direct- <br /> reading sampling equipment. At a minimum the following monitoring will be performed: <br /> Adirect-reading photoionization detector (PID)_meter (Thermo-Environmental Model 580A or <br /> equivalent) will be'used to monitor the concentrations of organic vapors in the work area. <br /> Measurements will be taken at intervals determined by the Site Safety Officer during drilling <br /> i <br /> F activities. The meter will be calibrated with isobutylene gas. Total organic vapor measurements <br />' .._ wllbe us_e ..ro.. dem�.-_- the appropvelsof respiratory proteio ,andidentflery y-.conditi�s <br /> that would require site evacuation. Total organic vapor concentrations in the workersbreathing <br /> I <br /> C zone in excess of 100 ppm of volatiles above background will require the use of Personal <br /> Protective Equipment. Breathing-zone,concentrations in excess.of.250-ppm-will-stop..the.worki <br /> on-site until the work zone concentrations are reduced to below 250 ppm. <br /> EMPLOYEE TRAINING AND INFORMATION <br /> All site personnel working the exclusion zone will be in compliance with the training <br /> requirements of CFR 29, 1910.120. <br /> i <br /> C <br /> AKRSAFE.we 6 <br /> I L <br />
The URL can be used to link to this page
Your browser does not support the video tag.