Laserfiche WebLink
Mr. Willard Alloway <br /> December 9, 1996 <br /> Page 2 <br /> 5 . Soil gas and types of Quality Assurance/Quality <br /> Control <br /> (QA/QC) samples to be collected; <br /> 6 . Analytical methods and laboratory QA/QC control <br /> measures; <br /> 7 . The names of the active soil gas contractor and <br /> on-site mobile laboratory to be used; <br /> 8 . Waste generation and management; <br /> 9 . Local permitting requirement; and <br /> 10 . Health and Safety Plan. <br /> Please submit the soil gas workplan on or before <br /> December 30 , 1996 . If you have any questions, please <br /> contact me at (916) 323-3372 or Mr. Jerry Marcotte at <br /> (916) 322-9224 . <br /> Sincerely, <br /> ✓ �tYl� <br /> Jean Young <br /> Hazardous Substances Engineer <br /> Site Mitigation Program <br /> cc : Ms . Dolores Staudenraus <br /> 611 Washington Street, Suite 23305 <br /> San Francisco, California 94111 <br /> Mr. David Heinrich, REA <br /> Texaco Refining and Marketing Inc . <br /> 5330 Primrose Drive, Suite 137 <br /> Fair Oaks, California 95638 <br /> Mr. David E. Moser, Esquire <br /> 3 Embarcadero Center, Suite 1800 <br /> San Francisco, California 94111 <br /> Mr. Steven Goldberg, Esquire <br /> 555 Capitol Mall, 10th Floor <br /> Sacramento, California 94111 <br />