f <br /> fi <br /> 1740 HOUSTON,STOCKTON <br /> CLOSURE CHRONOLOGY <br /> Page 2 <br /> I <br /> I� <br /> 04/27/99 5 soil borings B1 to B5 were advanced at the site. B4 and B5 were converted to <br /> MW4 and MW5,respectively. Analyses included the 5 oxygfenate compounds. <br /> MTBE was detected in both soil and groundwater samples. <br /> f; 1 <br /> 11/28/00 3 wells MW-6 to MW-8 were installed. i <br /> f <br /> 02/05/01 Date of the report of the November 2000 work. <br /> 05/09/01 EHD received a report dated April 25,2001 that included a calculation of the <br /> remaining dissolved MTBE mass prepared by COS consultant Advanced <br /> GeoEnvironmental,Inc. (AGE) EHD did not accept this ckculation because the <br /> extent of the plume has not been defined. e <br /> i <br /> 07/12/01 EHD met with the City of Stockton and discussed that the MTBE groundwater <br /> plume continued to migrate down gradient toward the north-"northwest. EHD <br /> requested additional investigation to define the vertical extent and lateral extent of 1 <br /> the contamination. ; <br /> 02/19/02 Three soil borings 138,B9,and B10 were advanced at the site. B9 and B10 were , <br /> subsequently converted into deep wells MW9 and MW10,respectively, to <br /> investigate the vertical extent of the contamination based on the 24-hour turn 1 <br /> around analyses of the grab groundwater samples collected from B8. <br /> 10/08/02 . Date of the report of the February 2002 work. <br /> 03/12/03 Regional Water Quality Control Board (RWQCB) staff and EHD agreed in a <br /> meeting that the MTBE plume has not been defined. I <br /> 07/17/03 Two deep Cone Penetrometer Technology(CPT) borings were advanced down <br /> gradient to assess the vertical extent of the contamination. i <br /> 07/24/03 EHD agreed the plume has been defined. EHD discussed with RWQCB for <br /> potential site closure concurrence. RWQCB recommended a`'fate and transport <br /> model of the dissolved MTBE plume be submitted. <br /> 09/02/03 Date of CIosure Summary Report with soil and groundwater tabulated results,CPT 4 <br /> work performed on July 2003,and boring logs. I <br /> 10/10/03 Date of closure report that includes a Non-Steady State Spreakdsheet Analytical <br /> Model of the MTBE plume prepared by AGE. The model demonstrated a travel <br /> time of 4.3 years for a distance of 1,700 feet at a velocity of 0.07 feet per day(sandy <br /> silt to silty sand) before.the concentration of MTBE reach 4.96 micrograms per <br /> liter. <br /> i <br /> The report also included an estimate of attenuation of the diss€olved MTBE by <br /> dispersion in a down-gradient direction to be less than 1260 days based on historical <br /> quarterly monitoring well results of MW 3,MW-4,MW-6,M`Y/-9,and MW-10. <br />