My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOUSTON
>
1740
>
3500 - Local Oversight Program
>
PR0545289
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 11:39:49 AM
Creation date
2/11/2020 8:33:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545289
PE
3528
FACILITY_ID
FA0003828
FACILITY_NAME
VAN BUSKIRK GOLF COURSE
STREET_NUMBER
1740
STREET_NAME
HOUSTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16307036
CURRENT_STATUS
02
SITE_LOCATION
1740 HOUSTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> City of Stockton sites <br /> Page 2 <br /> 1740 Houston <br /> Three additional monitoring wells (MVV-6, MW-7, and MW-8) were <br /> installed in October 2000 to evaluate the extent of the MTBE contaminant <br /> plume. AGE presented the laboratory results at the meeting but the QMR <br /> has not been submitted to PHSIEHD at this time. It was agreed that at <br /> least two additional QMR would be required before deciding the next step <br /> that would be needed to bring this site to closure. PHS/EHD also requires <br /> the continuation of analyses for diesel in addition to the oxygenates in the <br /> quarterly sampling. <br /> 1465 S. Lincoln <br /> Preparation of the request to the Central Valley Regional Water Quality . <br /> Control Board for concurrence on a "no further action required" <br /> determination for the 12 000g allon UST removed from this site is <br /> pending. The PHSIEHD staff reviewing the closure plan for the 10,000 <br /> gallon UST piping stated that the end':of the piping still has not been <br /> located. PHSIEHD requires locating the piping before the closure in place <br /> of the piping can be approved. AGE has proposed to video the piping to <br /> determine its location and is to schedule this work with PHSIEHD. <br /> A meeting with the City of Stockton to discuss the status of their sites at that time <br /> is scheduled for 10:00 a.m. on March 16, 2001, at the offices of PHSIEHD. 1 <br /> If you have any comments or questions contact Margaret Lagorio at (209) 468- <br /> 3449 or the PHSIEHD site manager. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Margaret�LagodoSupervising REHS <br /> Site Mitigation Unit <br /> c: CVRWQCB - Marty Hartzell <br /> AGE - Bill Little <br /> ATC - Jeanne Homsey <br /> J I <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.