Laserfiche WebLink
City of Stockton A68101.02C <br /> February 23, 1996 Page 4 <br /> TAB . <br /> Summa o€groundwater Dada <br /> Monitoring Well Depth to Groundwater Surveyed wellhead Elevation Calct&ted Groundwater <br /> FBSG I FrAM. FJevarion mm <br /> Date of Meaatrrment:June 22,1994 <br /> Groundwater Flow Direction: North <br /> MW-1 13.45 7.76 -5.69 <br /> MW-2 13.33 7.49 -5.84 <br /> MW-3 13.26 7.74 -5.52 <br /> Date of Measurement October 27,1994 <br /> Groundwater Flow Direction: North <br /> MW-1 14.05 7.76 -6.29 <br /> MW-2 14.14 7.49 -6.65 <br /> MW-3 14.01 7,74 <br /> -6.27 <br /> Date of Mcawrc=nt November 30,1994 <br /> Groundwater Flow Direction: North <br /> • MW-1 14.00 7.76 -6.24 <br /> MW-2 14.05 7.49 -6.56 <br /> MW-3 13.92 7.74 -6.18 <br /> Date of measurement December 23, 1994 <br /> Groundwater Flow Direction: North <br /> MW-1 13.83 7.76 -6.07 <br /> MW-2 13.87 7.49 -6-38 <br /> MW-3 13.73 7.74 -5.99 <br /> FBSG = feet below site grade <br /> FMSL = feet above(below)mean sea level <br /> During the period June, 1994 to September, 1995 groundwater samples were collected from <br /> selected locations and analyzed in the laboratory for selected PPCs. Table 3 summarizes <br /> the groundwater sample analytical data results. <br />