Laserfiche WebLink
City of Stockton A68101.02A <br /> . July 21, 1995 Page 2 <br /> excavation bottom. Field screening with the PID of samples collected at 4 feet BSG on the <br /> - south end wall and at 5 feet BSG on the northwest wall indicated concentrations of VOCs <br /> of 2 and 3 ppm respectively. <br /> Twining expressed a concern about the volume of water in the excavation and how to <br /> dispose of it. Therefore the client made a decision to temporarily stop excavation work and <br /> formulate a plan to deal with the water in the excavation. A sample of the water in the <br /> excavation was collected for chemical analysis in the laboratory. The water sample was <br /> analyzed for gasoline constituents and the results of the analysis are summarized in Table <br /> 1. <br /> Table 1 -` <br /> Groundwater Sample Analytical Results <br /> Dated Sampling. '64/bS/95 <br /> ::. <br /> sample <br /> larauon ..: ' :rug71- .... ...',..{fi/t- :.;►��. ..;<'. �� ..: <br /> Excavation 1,000 2,000 800 6,400 17,000 <br /> DLR 50 So so So 5,000 <br /> BTBX = benzene,toluene,ethylbenzene,and xylenes <br /> TPH-G = total petroleum hydrocarbons-gasoline range constituent <br /> pg/L = microgram per liter <br /> DLR = Detection limits For reporting purposes. <br /> Note: Detection limits for these analyses are provided in the attached laboratory reports. <br /> The west end of the excavation was partially backfilled with pea gravel on April 5 by the <br /> excavation contractor, TBI Engineering, Inc. This backfill was placed at the direction of Mr. <br /> John Fukumoto of The City of Stockton. Soil removed from the excavation was stockpiled <br /> at the location shown on Drawing 1. <br /> Based on the concentrations of gasoline constituents detected in the groundwater sample <br /> collected from the excavation, it appears that PPCs have impacted groundwater. <br /> Furthermore, the groundwater elevation precluded assessment of the extent of PPCs <br /> migration in soil around the former UST's and dispensers locations. Therefore, it appears <br /> prudent to conduct additional work to complete the soil assessment and attempt to remove <br /> the soil impacted with PPCs. <br /> I <br /> -7 <br />