Laserfiche WebLink
Michael Infurna <br /> .May 10, 1995 <br /> Page 2 <br /> indication that. your agency has taken airy action to compel the past and present <br /> owners and/or operators-lof. the site to undertake an erivrronmehtal investigation <br /> to determine the scope and "tent,of contamination at the Exxon site:. <br /> In light of Geocon's:findings, the age and construction.of the 1✓xxon tanks, :and <br /> -Ael lack:of any evidence indicating that the tanks have been drained;of <br /> product, we..are very concerned that free product may resen be leaking <br /> from the Exxon tanks and:continuing to cont4minate the groundwater beneath <br /> tate Exxon and Togo's site. Cou you please provide us with..some assurance <br /> that the tanks.have-in fact been;drained of product? In addition,.could you <br /> ;phase advise whether your agency intends to;regtiire am>investigation of the f <br /> Exxon site and, if so, when it is anticipated that such investigation. *ill <br /> commence? t <br /> Thank you for your prompt attention to this matter. <br /> very truly yours, <br /> DOWNEY, BRAND, SEYMOUR & ROHWER <br /> CRAIG C. ALLISON <br /> CCA.rnpd _. <br /> cc. Elizabeth Thayer, Central 'Walley Regional Water <br /> Quality Control Board <br /> Steven H. Goldberg (firm) <br /> VVES 41256A:r <br /> DOWNEY BRAND SEYMOUR&ROHWER< <br />