My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUTCHINS
>
305
>
3500 - Local Oversight Program
>
PR0545307
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 3:02:32 PM
Creation date
2/11/2020 8:53:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545307
PE
3528
FACILITY_ID
FA0000932
FACILITY_NAME
DOMINO'S #8588
STREET_NUMBER
305
Direction
S
STREET_NAME
HUTCHINS
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03319020
CURRENT_STATUS
02
SITE_LOCATION
305 S HUTCHINS ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 305 S. HUTCHINS STREET <br /> LODI,CA <br /> i SITE HT TORY <br /> EE <br /> I • Atlantic Richfield and Union Oil Company operated' r. station in l E corner from <br /> 1926 to 1957. <br /> • Douglas Oil Company built the second;generation st tion in 1957. <br /> Douglas operated from 1957 to 197L <br /> • TexacooP erated born 11071 to 1977. <br /> • Texac+�removed underground tanks anti lines in 1979,prior to sale of property: <br /> • restaurant was constructed in 1981—A Togo's Sandwich!Shop currently operates at <br /> the site. <br /> • Subsurface er�virt►nmretrtal investigations starting in 1,901 found fuel hydrocarbons in <br /> soil and ground.water. <br /> • Chlorinated hydrocarbons and MTBE were detectedin ground"win 1992 and <br /> 1993, respectively; , <br /> +� Soil valor extraction system drew vapors from vapor extraction well V-W-1 between � <br /> June 1991. and March 1994, p <br /> • In second half of:1:994 more soil borings and monitoring wells were drilled and 5 <br /> onsite vapor extraction wells were installed. <br /> • In early 1996, a meeting was held with SrCPHS where it was.agreed that the site was <br /> can didate.for.passiue bioremediation and conditional',case closure;:. <br /> .w. <br /> i� <br /> j <br /> k <br /> 6 <br /> f <br /> -'�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.