Laserfiche WebLink
4v <br /> I <br /> Project No 58080-06-01 <br /> July 7, 1994 <br /> • Selecting an SSO <br /> • Issuing responsibility to the SSO to implement the health and safety requirements <br /> summarized in this Plan In addition, the PM shall require all project personnel to <br /> comply with the requirements set forth in this Plan <br /> • Informing the CHSS of violations of this Plan, and unsafe conditions, and will confer <br /> with the CHSS regarding changes to this Plan If deemed necessary, the PM, SSO <br /> or the CHSS may stop work due to violations to this Plan or unsafe conditions <br /> • Coordination with client representatives <br /> Corporate Health and Safety Specialist CHSS <br /> • Reviewing and approving this Plan and modifications to the Plan <br /> • Performing periodic audits of project activities to evaluate general compliance with <br /> the policies, procedures, directives, and guidelines presented in this Plan <br /> Providing environmental health, safety and industrial hygiene consultation as needed <br /> Evaluating site hazards with the PM for the preparation of this Plan <br /> Site Safety Officer (SSO) <br /> • Being knowledgeable of OSHA and Geocon health and safety protocols <br /> • Implementing this Plan under the authority of the PM <br /> • Providing onsite pre-work health and safety training for field personnel <br /> • Completing daily field logs and onsite health and safety training documentation <br /> • Monitoring onsite activities for violations to the provisions of this Plan and unsafe <br /> work conditions and reporting them to the PM <br /> • Procurement, inspection, and maintenance of health and safety equipment <br /> iPage 3 <br />