Laserfiche WebLink
+1 A, <br /> 04/13/1998 07:04 91656420 KRlaZ£�rJ SACRAMENT PAGE 02 I <br /> 1 <br /> ji <br /> � I k <br /> Wilbur Ellis Companypage 2 <br /> 212 Industrial Dr., Stockton <br /> .I <br /> The "Groundwater Sampling - Former Underground Tank Areae report(dated <br /> March 13, 1998) submitted to PHS-EHD by KRAZAN;'° Associates on March 17, <br /> 1998, recommended six (6) Geo-Probes be advanced around the former UGT ; <br /> area for collection of groundwater grab samples. TheGea-Probe 1 push-point <br /> proposal may be included, but only as a screening tool to determining the <br /> r placement of the wells. A workplan which includes thaw placement of at least <br /> three (3) monitoring wells for periodic sampling and determining the groundwater <br /> gradient direction must be submitted to PHS-EHD. jlj j <br /> The workplan to install the wells, the boring peffnlit application, and the$99 <br /> fee shall be subrnhtad to PHS-END before June 19, 1998. The field work is <br /> to start before June 30, 1998 and the report of findings is dare within ninety <br /> (90) days of the end of the field work. <br /> You may direct your submittals to Michael Infurna, Senior REHS, and you may <br /> i tall hire at (209)468-3454 should have any questions or wish to discuss your <br /> site- <br /> E <br /> Donna Heran, REHS, Director , M <br /> Environmental Health Division <br /> Michael J. lnfuma Jr., <br /> Senior REHS Margaret Lagorio, REHS <br /> LOP /Site Mitigation Unit IV I' Supervisor <br /> C <br /> i <br /> ii <br /> c: D. Reynolds/ R. & C_ Hallanger-ETAL-212 industrial Dr., Stockton i <br /> Pat Anderson - CVRWQCB!I. l <br /> i <br /> c: Cathy Reed - Krazan &Assocrates, 123 Commerce Circle, Sac., 95815 <br /> 3 ISI j <br /> :Ili <br /> ... _ .. .. <br /> + Of <br /> � <br /> p9st.W Fax 14ote 11671 <br /> from�Ktrt`i �� � <br /> TD �8+� <br /> Co. <br /> Ell Go.1D0PL <br /> PtiaM1e� <br /> qi <br /> prone# <br /> ax s 11l <br /> rax l 1 <br /> g <br />