My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
3500 - Local Oversight Program
>
PR0545309
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 9:40:49 PM
Creation date
2/11/2020 9:11:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545309
PE
3528
FACILITY_ID
FA0010339
FACILITY_NAME
H&H ENGINEERING CONST INC
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
02
SITE_LOCATION
212 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III <br /> 1. <br /> June 8, 1998 <br /> i� Project No. 034-98081 <br /> HEALTH AND SAFETY PL N <br /> ADDITIONAL SOIL AND GROUNDWATER ASSESSMENT <br /> H&H ENGINEERING <br /> 212 INDUSTRIAL DRIVE <br /> STOCKTON,CALIFORNIA <br /> ILI <br /> 1.0 INTRODUCTION <br /> activities planned for the investigation <br /> This plan describes the health and safety procedures for the <br /> ir <br /> at H&H Engineering,212 Industrial Drive in Stockton,California. All Krazan&Associates employees and <br /> field personnel will abide by this plan. It is intended that all project.work will comply with applicable codes <br /> and regulations of the United States Occupational Safety and Health Administration. Each field team <br /> member working on this project will have the g6neral responsibility to identify and correct any health and <br /> safety hazards and strive to make the work place safe. <br /> 1.1 Project Description <br /> This project is the investigation to be performed: by Krazan & Associates at the <br /> , <br /> i. previously-mentioned project site. The scope of project will incl:11de the advancement of direct push soil <br /> borings, drilling of exploratory soil borings, the installation of monitoring wells and the sampling of soils <br /> Eli <br /> and groundwater on the subject property. Sample labeling, preparation, shipment and analyses will also be <br /> performed. <br /> 1.2 Key Personnel &Responsibilities <br /> The following personnel who will have the overall responsibility for the safe operation of this <br /> investigation are: <br /> Project Directors: Dean Alexander <br /> Corporate Safety Officer: d Wendy Shanes <br /> Task Leaders: Bruce Myers <br /> On-site Safety Task Leader: Chad Pyatt <br />
The URL can be used to link to this page
Your browser does not support the video tag.