Laserfiche WebLink
III <br /> 1. <br /> June 8, 1998 <br /> i� Project No. 034-98081 <br /> HEALTH AND SAFETY PL N <br /> ADDITIONAL SOIL AND GROUNDWATER ASSESSMENT <br /> H&H ENGINEERING <br /> 212 INDUSTRIAL DRIVE <br /> STOCKTON,CALIFORNIA <br /> ILI <br /> 1.0 INTRODUCTION <br /> activities planned for the investigation <br /> This plan describes the health and safety procedures for the <br /> ir <br /> at H&H Engineering,212 Industrial Drive in Stockton,California. All Krazan&Associates employees and <br /> field personnel will abide by this plan. It is intended that all project.work will comply with applicable codes <br /> and regulations of the United States Occupational Safety and Health Administration. Each field team <br /> member working on this project will have the g6neral responsibility to identify and correct any health and <br /> safety hazards and strive to make the work place safe. <br /> 1.1 Project Description <br /> This project is the investigation to be performed: by Krazan & Associates at the <br /> , <br /> i. previously-mentioned project site. The scope of project will incl:11de the advancement of direct push soil <br /> borings, drilling of exploratory soil borings, the installation of monitoring wells and the sampling of soils <br /> Eli <br /> and groundwater on the subject property. Sample labeling, preparation, shipment and analyses will also be <br /> performed. <br /> 1.2 Key Personnel &Responsibilities <br /> The following personnel who will have the overall responsibility for the safe operation of this <br /> investigation are: <br /> Project Directors: Dean Alexander <br /> Corporate Safety Officer: d Wendy Shanes <br /> Task Leaders: Bruce Myers <br /> On-site Safety Task Leader: Chad Pyatt <br />