Laserfiche WebLink
i <br /> Ground Zero Analysis,Inc. <br /> i SITE SAFETY PLAN I <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZA worksites. Level D includes: <br /> i -Steel toed boots <br /> -Safety Glasses <br /> -Hard Hat <br />` For each task on this project, identify additional protective garments as required, include the <br /> a conditions under which the level of PPE would be modified for each task. <br /> 3 I <br />�# Task(s) Condition , Personnel Garment(s) <br />€ 1 Working Near Vehicle Orange Vests <br /> 1 >20 ppm for 5 minutes 112 Face Respirator <br /> i <br /> 1 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> 1 <br /> SITE CONTROL AND COMMUNICATIONS <br /> ;i <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> i Site will be secured as follows: Yellow Caution Tape, fencing will be used were applicable. <br /> Work.Zones will be marked as follows: Barricades and/or caution tape will be used to mark off hot <br /> work zone. <br /> a <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE. <br /> PAGE 9 <br />