Laserfiche WebLink
r APPROX 250' <br /> TO WKINLEY AVENUE <br />' LOCATION OF <br /> FARMER <br /> MW-I GASOLINE PUMP <br /> =7 800 <br /> 7 <br /> 9 \ MW-3 <br /> � r{ B=1 1 <br /> GENERAL AREA \�C� 1 \ J�t <br /> OF FORMER i b <br /> 1 000 GALLON / <br /> UNDERGROUND ,Q �$STORAGE TANK 0 <br /> OFFICE/SHOP <br /> ¢ O ` BUILDING <br /> a <br /> U <br /> MW 2 <br /> U lc�B=5 8 <br /> a. a <br /> Z Q <br /> O <br /> w � <br /> 3 � <br /> EXPLANATION <br /> SUBJECT SITE BOUNDARY <br /> Mw 2 MONITORING WELL LOCATION WITH <br /> R=5 8 X BENZENE CONCENTRATION IN <br /> MICROGRAMS PER LITER <br /> OST <br /> ,00p BENZENE CONCENTRATION CONTOUR <br /> IN MICROGRAMS PER LITER 0 50 100 <br /> *INTERPRETATION BASED ON CURRENT AND PREVIOUS <br /> GEOLOGIC AND CHEMICAL DATA(REFER TO AUGUST 28, 1998 SCALE IN FEET(1) <br /> PHASE I AND DECEMBER 17, 1998 PHASE 11 REPORTS) <br /> Scale Date <br /> BENZENE CONCENTRATION CONTOUR MAP AS SHOWN 2100 <br /> (DECEMBER 21,1999) Drawn by Approved by Kraz ^ <br /> H & H ENGINEERING PROPERTY C G J R N ENGINEERS GEOLOGISTS AND ENVIRONMENTAL SPECIALISTS <br /> 212 INDUSTRIAL DRIVE, STOCKTON, CALIFORNIA Project 034-o FlgureNo Ten Offices Serving the Western United States <br /> 034-98081 2 <br />