Laserfiche WebLink
APPROX 250' <br /> TO MCKINLEY AVENUE LOCA"T"ION OF <br /> 9 FORMER <br /> mw_l \ GASOLINE PUMP <br /> v TPH G=28,000 <br /> \ \ \ \ MW-3 <br /> PH-G=100 <br /> U GENERAL AREA\ <br /> OF FORMER \\ <br /> 1 000 GALLON <br /> Q LTOOAN <br /> RAGETA <br /> SNKK <br /> r p / <br /> O <br /> OF ICE/SHOP <br /> YUILDING <br /> V ` X MW-2 <br /> � TPH-G=280 � <br /> z <br /> w <br /> EXPLANATION <br /> SUBJECT SITE BOUNDARY <br /> TPH-G TOTAL PETROLEUM HYDROCARBONS AS GASOLINE <br /> MONITORING WELL LOCATION WITH <br /> TPHi-GV=ND TPH-G CONCENTRATION IN N(0) <br /> MICROGRAMS PER LITER <br /> �O TPH-G CONCENTRATION CONTOUR <br /> IN MICROGRAMS PER LITER 0 50 100 <br /> *INTERPRETATION BASED ON CURRENT AND PREVIOUS <br /> GEOLOGIC AND CHEMICAL DATA(REFER TO AUGUST 28, 1998 SCALE IN FEET ( ) <br /> PHASE I AND DECEMBER 17, 1998 PHASE II REPORTS) <br /> TOTAL PETROLEUM HYDROCARBONS AS Scale Date _ <br /> GASOLINE CONCENTRATION CONTOUR MAP AS SHOWN 1194 <br /> (JANUARY 28, 1999) <br /> Di-awn by Approved by Krazan <br /> m <br /> C G BEM ENGINEERS GEOLOGIS'T'S AND ENVIRONMENTAL SPECIALISTS <br /> H & H ENGINEERING PROPERTY Project No Figure No 'Ten Offices Serving the Western United States <br /> 212 INDUSTRIAL DRIVE, STOCKTON, CALIFORNIA 034-98081 3 <br />