Laserfiche WebLink
i <br /> s <br /> ROJECT H&H Engineering Property Boring Na <br /> 212 Industrial Drive, Stockton, California <br /> Project No 034-98081 <br /> ATE DRILLED TYPE OF BORING <br /> August 13, 1998 3-114" 1 D Hollow Stem Auger <br /> PILLING EQUIPMENT ELEVATION & DATUM LOGGED BY <br /> Mobile B61 HDX C Pyatt <br /> AMPLING METHOD DEPTH TO WATER FIRST COMPL 24 HRS <br /> 2" split spoon with brass sleeves <br /> C O O <br /> Elevation Q Y U `o " <br /> Depth (Ft) O o E a m SOIL DESCRIPTION <br /> C: <br /> XZ <br /> ao BOTTOM OF BORING <br /> 45 <br /> 50 <br /> 55 <br /> 60 <br /> 65 <br /> 70 <br /> 75 <br /> 'R=Refusal, greater than 100 blows/foot KRAZAN & ASSOCIATES, INC Sheet 2 of 2 <br />