My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003095
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
1702
>
3500 - Local Oversight Program
>
PR0545315
>
ARCHIVED REPORTS_XR0003095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 11:46:15 AM
Creation date
2/11/2020 9:51:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003095
RECORD_ID
PR0545315
PE
3528
FACILITY_ID
FA0003572
FACILITY_NAME
DAVES UNION SERVICE
STREET_NUMBER
1702
STREET_NAME
JACKSON
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
227-14-011
CURRENT_STATUS
02
SITE_LOCATION
1702 JACKSON ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> RESNA Industncs Inc <br /> Quality Assurance/Quality Control Plan <br /> tRevised November 199^_ <br /> ' To reduce the potential for cross contamination between wells, the monitorings will take place <br /> in order from the least to most contaminated, if known. Wells containing free product will be <br /> ' monitored last Between each well monitoring the equipment will be decontaminated. <br /> ' Water level data collected from the wells will be used to develop a groundwater contour map <br /> for the project site Groundwater flow will be estimated to be perpendicular to equipotential <br /> ' Iines drawn on the map. <br /> ' 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal. <br /> ' Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br /> volumes will be calculated in the following manner- <br /> VOLUME OF SCHEDULE 40 PVC PIPE <br /> ' Diameter (inches) I D (inches) Volume <br /> Galllinear feet <br /> 2 2067 0 17 <br /> 4 4 026 066 <br /> VOLUME OF OPEN BOREHOLE AND ANNULAR SPACE BETWEEN CASING AND HOLE <br /> Hale Volume/Linear Feet of Hole Nominal Volume/Linear Feet of <br /> ' <br /> Diameter Casing Annular Space <br /> Diameter <br /> (inches) <br /> Gallons Cubic Feet (inches) Gallons Cubic Feet <br /> ' 7.25 2 14 029 2 1 91 0.26 <br /> 825 278 037 2 255 0.34 <br /> 1025 429 057 2 406 0.54 <br /> 1025 429 057 4 346 0.46 <br /> 1225 613 082 4 530 071 <br /> ' Annular volumes will be multiplied by 30%to account for porosity of filter pack <br /> QAQCIOn FNL 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.