Laserfiche WebLink
r <br /> RESNA Industries Inc <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> by allowing the fluid to flow slowly along the sides of the vessel All containers will be filled <br /> above the top of the opening to form a positive meniscus No headspace should be present in <br /> rthe sample container once it is sealed. After the vial is capped it will be inverted to check for <br /> air bubbles If bubbles are present the sample will be discarded and replaced If it is not <br /> rpossible to collect a sample without headspace, the problem will be noted on the field <br /> technician's sampling log <br /> r <br /> Immediately following sample collection, samples will be labeled and stored in an ice chest <br /> containing frozen chemical ace sealed in plastic bags. Sample labels will contain the following <br /> information. <br /> 1 <br /> ✓ date and time <br /> ✓ project ID <br /> ✓ sample ID <br /> ✓ name of sampler <br /> ✓ type of analysis to be performed <br /> All samples will be transported under chain-of-custody protocol to a state certified laboratory <br /> rwithin 24 hours A sample container filled in the laboratory with organic free water and carried <br /> unopened during the sampling trip will also be provided (Trip Blank) A "high-low" <br /> r temperature recording thermometer will also accompany sample shipments to ensurePe ro r <br /> P <br /> ' sample temperature maintenance. <br /> ' Samples will be transported either by RESNA personnel or by private carrier. Analytical <br /> holding times will be considered In determining sampling and shipping schedules. Friday <br /> rshipment/Saturday laboratory receipt of samples will be coordinated in advance with the <br /> laboratory <br /> QAQC1092 FNL 14 <br /> 1 <br />