My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012735
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
1702
>
3500 - Local Oversight Program
>
PR0545315
>
ARCHIVED REPORTS_XR0012735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 12:18:01 PM
Creation date
2/11/2020 9:56:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012735
RECORD_ID
PR0545315
PE
3528
FACILITY_ID
FA0003572
FACILITY_NAME
DAVES UNION SERVICE
STREET_NUMBER
1702
STREET_NAME
JACKSON
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
227-14-011
CURRENT_STATUS
02
SITE_LOCATION
1702 JACKSON ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�4R <br /> I Volume of Open Borehole and Annular Space <br />' Between Casing and Hole <br /> volume/ <br /> volume/ linear ft. of* <br /> Hole linear ft. Nominal <br /> Casing Diameter Annular Space <br /> Diameter of hole Gal. Cu. Ft. <br /> Gal. Cu. ft. {inches} <br /> (inches} --------------------- <br /> - <br /> -------------.. <br /> ---------------- 1.91 Q.26 <br /> 7.25 <br /> 2.14 0.29 2 <br /> 8.25 2.78 0.37 <br /> 2 2.55 0.34 <br /> 10.25 <br /> 4.29 0.57 2 4.06 0.54 <br /> 10.25 <br /> 4.29 0.57 4 3.46 0.46 <br /> 12.25 6.13 0.82 <br /> 4 5.30 0.71 <br /> *Note: Annular volumes will be multiplied by 30% to account for <br /> porosity of filter pack- <br /> if the aquifer is slow to recharge, development will <br /> ow to pactialy continue' <br /> continue until rechargodu� Versus timer <br /> r7illCbel <br /> recorded. <br /> The volume of water p e <br /> All withdrawn groundwater will be stored ion is rantede by the <br /> aallon waste drums unless c p to discharge the water to the <br /> appropriate regulatory g Y <br /> ground surface or sanitary sewer• i'-gummed water will be <br /> appropriate <br /> labeled <br /> dtwith the disposal sbased onource fcantam nation levels. <br /> to p ensure <br /> 11.0 Soil Sampling Protocol <br /> 11.1 Sample Collection During Drilling Activities <br /> ory <br /> A proposal willro osedsubmitted <br /> boring/sampling locations�atThe <br /> Authority with p psite will <br /> orings at each <br /> detertnthe field by the and number of Project minedinProject Geologist/Engi eer. e <br /> Friar to arriving at the sample site, the drill rig/augers <br /> will be steam cleaned and all sample equipment will be <br /> cleaned. Cleaning will be conducted on-site an all sampling <br /> equipment between each sample interval. <br /> ied <br /> Soil samples will be obtained using a California long if two <br /> - split-spoon sampler containing three, <br /> inch diameter brass tubes. The sampler ai140 bpoundi hammer <br /> -- ----.—._-- ---- -. _-inches--ahead..._of -rhe-._hollow stem auge_ by <br /> 4 <br /> with a 30 inch drop in accordance- with-American....society <br /> E, <br />
The URL can be used to link to this page
Your browser does not support the video tag.