Laserfiche WebLink
Decontamination will 4y/ done with steam cleaner o%Jarger equipment and <br /> r deionized water with Spic and Span' on smaller equipment. <br /> Several soil samples will be taken to determine the grain size <br /> distribution of the soil encountered at the site. <br /> All soil temporary removed will be stockpiled on a 10 mil plastic sheet <br /> and a 10 mil plastic sheet will be used to cover the soil to control <br /> any gasoline contaminates from leaving the temporary pile of soil . No <br /> soil will be allowed to leave the project site area as shown on figure <br /> 2. <br /> All soil samples taken will be tracked by a formal chain-of-custody of <br /> samples to maintain the integrity of samples taken. All soil samples <br /> taken shall be with brass sampling tubes to prevent minimum disturbance <br /> of soil sample. Once a sample is taken the brass tube shall be sealed <br /> with teflon caps and duct tape on both ends. The samples shall be <br /> labeled and placed in a cold storage box for transportation to the <br /> laboratory. Each sample taken will be issued its own sample <br /> identification number for identification proposes. <br /> Laboratory analysis of soil shall conform to EPA 8020 and modified <br /> 8015, see enclosures. The laboratory analysis will be conducted by <br /> California Water Labs, Inc. in Modesto, California. <br /> 'r Upon receiving the laboratory report we will prepare a Soil Remediation <br /> Proposal for San Joaquin County Environmental Health District and <br /> California Regional Water Quality Control Boards review. <br /> TIME SCHEDULE <br /> Our time schedule is four weeks from `the time we receive County <br /> approval to start work to the time we submit a Soil Remediation <br /> Proposal with the laboratory finding and our recommendation for cleanup <br /> of project site. <br /> HEALTH PLAN <br /> A six foot chain-link fence will be erected around soil removal area <br /> to prevent anyone entering the area. Area entrance will be through a <br /> ten foot gate to the area. The fence will remain in place until the <br /> soils are returned to the hole. Warning signs will be placed on the <br /> fence and the gate to the area will be padlocked. A photoionization <br /> device will be used to monitor area in which workers will be present <br /> to protect those workers. Appropriate cloth overalls and rubber gloves <br /> will be worn to protect those in immediate contact with soil . Nearest <br /> hospital to the project site is Lodi Memorial located at 975 South <br /> Fairmont in lodi . <br /> Field equipment is to include a fir4 extinguisher, first aid box, MX251 <br /> LEL & Oxygen Monitor with alarm and/or the Gastech Model 1314S. Monitor <br /> of air will be continuous during soil removal at site. All work will <br /> stop if oxygen deficiency below 19. 5 % or combustible gases is present <br /> in a quantity to endanger workers safety at 20% or above Lower <br /> Explosive Limit ( LEL) . <br /> Emergency Phone Numbers (911 ) <br /> Lodi Memorial Hospital 209-334-3411 <br /> Lodi Fire Department 209-333-6735 <br /> Lodi Ambulance 209-334-0830 <br /> V <br />