Laserfiche WebLink
FIGURE 3 Sthentatic of Monitoring Wells Construction <br /> to Test the.Upper Water'Strata <br /> Water Tight Lid <br /> Ground Surface <br /> Cap •big, O <br /> :6.a. <br /> Celt <br /> 00 <br /> \\ Bentonite Annular <br /> Seal <br /> Well Casing <br /> .• *' Filter Pack <br /> SO <br /> v Ground Water LevelNEW <br /> :. <br /> • <br /> '•' •' Perforated <br /> Casing <br /> Aquifer <br /> Min.6-inch <br /> _ Borehole <br /> \1011 •. <br /> Clay (Aquitard) • <br /> \\ <br /> Typical Monitoring Well Construction <br />