Laserfiche WebLink
i <br /> 1 <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Taylored Tours j <br /> Job Location: 330 E. Kettleman Lane, Lodi, CA <br /> Client Name: Arnie Taylor <br /> Project Number: 99-313 <br /> General Work Description: Advance two soil borings to collect soil and groundwater samples to <br /> investigate current subsurface conditions related to a forir er diesel fuel dispenser, part of <br /> underground diesel fuel storage tank system. r <br /> SSP Prepared by: Sean Garvey <br /> On-site Safety Officer: Sean Garvey <br /> i <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to allon-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site } <br /> employees, subcontractors, and visitors prior to entering the site. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GM at the job site. All personnel working for GZA at the'job site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area. Field personnel may deviate <br /> from the safety provisions set-forth in this SSP, but only;i to upgrade or increase the safety <br /> requirements. GM personnel may suspend work if unsafe :working conditions are identified or <br /> it <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. If <br /> changes in site or working conditions require changes 11in safety procedures, appropriate <br /> amendments to this SSP will be provided by the GZA project manager or supervisor, with the <br /> written approval of the GZA Health and Safety Director. <br /> PAGE 1 <br /> k <br /> ii � <br />