My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
3500 - Local Oversight Program
>
PR0545335
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 8:10:50 PM
Creation date
2/11/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545335
PE
3528
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
02
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 State Water Resources Control Board r�R <br /> Division of Clean Water Programs u _ <br /> 100I 1 Street•Sacramento,California 95814 <br /> Winston H.Hickox P.O.Box 944212•Sacramento,Califomia•94244-2120 <br /> Secretary for (916)341-5681 * FAX(916)341-5806 • www.swrcb.ca.gc)v/cwphome/ustef <br /> Gray Davis <br /> Protection The energy challenge facing California is real. Every Californian needs to take immediate Action to reduce energy consumption. Governor <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our website at www.wrcb.ca.gov. <br /> JUN 2 5 2001 <br /> Ultramar, Inc. <br /> Gerald A. Stauffer - <br /> P O Box 696000 <br /> San Antonio,TX 78269-6000 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND (FUND),NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAIM NUMBER 016549; FOR SITE ADDRESS: 401 KETTLEMAN LN W, <br /> LODI <br /> Your claim has been accepted for placement on the Priority List in Priority Class "D"with a deductible <br /> of$10,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff reviews, verifies, and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until. <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid, a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation, or your claim application contains a material error,the claim will be rejected. In such <br /> event,you will be issued a Notice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material errcr resulting from fraud or intentional or negligent misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the <br /> invoices, (3) copies of technical documents(bids,narrative work description,reports), and(4)evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time;however, they will definitely be <br /> required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Division 3, Title 23, California Code of Regulations. Article 11 categorized the <br /> corrective action process into phases. In addition, Article 11 requires the responsible party to submit an <br /> Calilbrnia En vironmental Protection Agency <br /> �a Recyc%dPnper <br />
The URL can be used to link to this page
Your browser does not support the video tag.