Laserfiche WebLink
w <br /> h <br /> Ultramar <br /> ,i <br /> - -'� 7 <br /> Ultramar Inc. 1 P � <br /> P.O.Box 711.": 209-584-6113 Credit&Wholesale <br /> .209-583-3330 Administrative <br /> 525 W.Third rd Street 209-583-3302 Information Services <br /> (209)582--00 241 <br /> Hanford, 93232-0466 209-583-3358 Accounting <br /> ENVIRONMENTAL PROJECT <br /> ._QUARTERLY STATUS REPORT . <br /> DATE REPORT SUBMITTED: January 28, 1994 <br /> QUARTER ENDING: December. 31, 1993 <br /> SERVICE STATION NO. : 513 <br /> ADDRESS: 401 West=Kettleman Lane, .Lodi, California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest . TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> In August 1993, ground-water monitoring wells- (MW-1, MW-2, and <br /> MW-3) were installed in an- _effort to evaluate both <br /> ground-water ' gradient and water quality. Also, three boring <br /> were completed under the tanks. and dispenser islands. Soil <br /> analyses showed nondetectable TPHg and 8TEX concentrations. <br /> Initial groundwater samples indicated concentrations just <br /> Above the detectionlimits in some wells. <br /> SUMMARY OF THISQUARTER'S ACTIVITIES: <br /> Groundwater Monitoring was performed°'December. 13_, 1993. <br /> RESULT OF UARTERLY MONITORING: <br /> Ground-water "samples .did not ,contain detectable amounts of <br /> hydrocarbons <br /> PROPOSED ACTIVITY OR WORK FOR NEXTQUARTER: ' <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> - First Quarter Groundwater -= <br /> Monitoring March 1994 <br /> BEACON . <br /> A Member of the Ultramar Group of Companies #1 Quality and Service . <br /> :UKramar <br /> a <br />