Laserfiche WebLink
17 January 2020 AdvancedGeo <br /> Project No. 19-4964 An EmpVvee-Owred Company <br /> Page 7 of 14 <br /> 5.2. SOIL LITHOLOGY AS RELATED TO FUTURE ONSITE SEPTIC USES <br /> The soil was visually described in accordance with the Unified Soil Classification System <br /> by a representative of AGI under the supervision of a California Professional Geologist. <br /> The soil collected from the percolation test hole boring consisted of moist, fine-grained <br /> silty sand from surface grade to approximately 42 inches bsg. The soil type is considered <br /> permeable and sufficient for liquid waste disposal and treatment. <br /> 6.0. PERCOLATION TEST INFORMATION <br /> A percolation soil suitability test was performed at the site under EHD permit No. <br /> SR0081581 using a four-inch diameter soil boring established to a depth of 42 inches <br /> bsg. A site map showing the approximate location of the percolation test hole is illustrated <br /> in Figure 2. A precise description of the location and construction of the percolation test <br /> hole is included in Appendix D (EHD form 42-03 revised 11/02/2009). The soil suitability <br /> study was conducted within the area of the proposed septic system leach field. <br /> 6.1. NUMBER OF PERCOLATION TESTS PERFORMED <br /> One shallow percolation test was performed at the site. The appropriate percolation test <br /> procedures established by the EHD were followed for the test (Procedures #2 and #3). <br /> The percolation test hole was pre-soaked overnight for 24 hours followed by a four-hour <br /> percolation testing period. <br /> 6.2. CONSTRUCTION OF PERCOLATION TEST HOLE <br /> On 09 January 2020, one boring was advanced for a shallow percolation test. The boring <br /> was advanced using a four-inch diameter hand auger to a depth of 42 inches bsg. The <br /> boring was located within the area of the proposed septic system disposal field. Following <br /> borehole advancement, the sides of the boring were scraped, and loose material was <br /> removed from the borehole. Once the borehole was cleared of loose material, two inches <br /> of coarse sand was added to the borehole. The borehole was then filled with water to a <br /> depth of 12 inches above the sand at the time of 0836. The test hole was then covered <br /> for 24 hours to allow for complete saturation of the borehole. <br /> 6.3. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK <br /> On 10 January 2020, the boring was found to be completely dry, intact and in good <br /> condition. <br />