Laserfiche WebLink
U.S.Department of Ilumcl:md securiq <br /> PIS\{A Region la <br /> I I11 nroaduay,suite 1200 <br /> i1r;!` U ' 't11YU Oakland,CA.9,1607-1052 <br /> J6.;citJill Counly <br /> Conuitutlib/ucvtaopmonl �{�t FEMA <br /> February 18,2020 <br /> Giuseppe Sanfilippo,Project Planner <br /> San Joaquin County <br /> Community Development Department <br /> 1810 Last 1 Welton Avenue <br /> Stockton,California 95205 <br /> Dear Mr.Sanfilippo: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA 1600266(UP,TG),(APN/Address:055-200-03/11241 North Thornton Road, <br /> Stockton)(Supervisorial District 3). <br /> Please review the current effective Flood Insurance Rate Maps(FIRMS)for the County of San <br /> Joaquin(Community Number 060299),Maps revised October 20,2016 and City of Stockton <br /> (Comnttlnity Number 060302),Maps revised October 16,2009. Please note that the City of <br /> Stockton,San Joaquin County,California is a participant in the National Flood Insurance <br /> Program(NFIP). The minimum,basic NFIP floodplain management building requirements are <br /> described in Vol.44 Code of Federal Regulations(44 CFR),Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements areas follows: <br /> • All buildings constructed within a rivcrinc floodplain,(i.e.,Flood Zones A,AO,All,Al;, <br /> and AI through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is mor above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rale Map. <br /> • I f the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM,any development must not increase base flood elevation levels. 'rhe term <br /> development mans any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings,other structures,mining,dredging,filling, <br /> grading,paving,excavation or drilling operations,and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed 2t Li:Or to the start of <br /> development,and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> mmw rema.gov <br />