Laserfiche WebLink
CONDOR EARTH TECHNOLOGIES <br /> 1125 N. ,GOLDEN STATE BLVD„ 1TURLOCK,CA GROUNDWATER WELL DEVELOPMENT FIELD FORM <br /> 1. SITE: klex) ��l u,4a�e,N Sc brad 1 F—WE—LLID' w <br /> PROJECT NO: .2500__. CONDOR PERSONNEL: 7/9 <br /> AMBIENT CONDITIONS(Circle): &I adverse (describe In notes section) DATE: 1 Z 9 <br /> — <br /> 2. DEVELOPMENT PROCEDURE: Circle:L3t n and Procedure / Other <br /> (Standard procadwe consats of surokto the well with a surge block for at Iran 7o nwas,faeawed by pwping the was of between S end 10 casing wumea of groundwater wMh a baler a a PUMP,uek the Purged water bee ames wiauaky <br /> clear of Wknent. If a Mallon ohne Procedure a wed,Protide a dasenpten In the addklonal notes so Won below.) II <br /> nn <br /> 3, PRE-PURGE DATA: Well Casing Depth(ft.) (detail) Weil Casing Diameter(in.)---Z__ <br /> Initiai Well Casing Depth(ft.) ZZ-10 {measured) <br /> -initial Depth-to-Water(ft.) 4 'U Measuring Point Location ,+,6/V C ov <br /> =Water Column(ft) lq,l Purge Vol.Calc.(for 1 casing vol.) (multipliers:2 inch=.163,4 inch=.653,5 inch=1,02) <br /> Field Inspection Sample: Appearance: Odor; jveryvC <br /> (Spvchfycolor da a of d1rhy.presence of sheen or Zodyd has- 5 ee sit .Moderet-or atmn <br /> 4. PURGE DATA: Purge Device:__- S f S41,1E 1 4 A 11F^ <br /> If pumped,specify: discharge rate(gpm) depth pump set at(ftJ <br /> Cas.Vol. <br /> Removed Time Vol. Pursed TemperaturepH E.C. <br /> U�(start) ( -t1w-) (circle: F J6 Il <br /> Notes: v i ll S A) l�dry c[e <br /> 4 (03/ 11 --A 1_ <br /> f <br /> Notes: OrS a U�v ���/ r"f. �• r ::ir <br /> 5 (c)-52 <br /> Notes: <br /> 6 <br /> Notes: <br /> 7 <br /> Notes: <br /> 8 <br /> Notes: <br /> 9 <br /> Notes: <br /> 10 <br /> Notes; <br /> Total Vol.Purged(gals.) Final Depth-to-Water(ft.) Final Well Casing Depth(ft.) -e 1 . <br /> 5. ADDITIONAL FIELD NOTES: ()� <br /> zt ---�u�P LLA ov e <br /> f;lforms\gwdff.wb1 (8195) <br />