My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
31400
>
3500 - Local Oversight Program
>
PR0545345
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 5:23:49 PM
Creation date
2/11/2020 4:40:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545345
PE
3528
FACILITY_ID
FA0002994
FACILITY_NAME
NEW JERUSALEM SCHOOL
STREET_NUMBER
31400
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25527012
CURRENT_STATUS
02
SITE_LOCATION
31400 S KOSTER RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lr <br /> �..� <br /> " <br /> " <br /> CONDOR EARTH TECHNOLOGIES,.INC. <br /> HEALTH AND SAFETY PROCEDURES <br /> i <br /> r <br /> NEW JERUSALEM SCHOOL <br /> 31400 KOSTER ROAD <br /> TRACY, CA 95376 <br /> Merced County <br /> Condor Earth Technologies, Inc. (Condor) has adopted the following health and safety procedures for <br /> working with organic contaminants encountered during investigative sampling operations_ This Health <br /> and Safety Plan is for the sole use of Condor personnel and subcontractors. Condor will not accept any ► <br /> responsibility for use, or lack therefore, of this plan by any other parties. Condor personnel will be <br /> responsible for adhering to standard safety procedures during all Sampling activities. <br /> All work will be done in accordance with current OSHA regulations and all personnel working within the <br /> exclusion zone will have completed a 40-hour OSHA training course and be current with. required <br /> refresher courses. A tailgate safety meeting will be held prior to com!)Icncement of work each day and <br /> this site-specific Health and Safety Plan will be discussed withl�and presented to all crew members for <br /> their signatures. <br /> 1.0- SITE ACCESS <br /> Access to the project site shall be limited by the site perimeter (minimum of 20 feet)_ In no case <br />�. shall the exclusion zone for al non-authorized personuetbe less than 20 feet from the septic tank <br /> location. No smoking will be allowed in the exclusion zone. <br /> f 2.0- SITE MANAGER <br /> CThe site manager shall coordinate all activities of equipment and personnel at the project site. <br /> Site manager responsibilities will include the following: <br /> fa. Limiting access within the site perimeter to authorized personnel. I <br /> b. . Providing a written log of on-site activities and events..: <br /> ' � t <br /> C. Notification of regulatory agencies during emergency procedures. <br /> d. Enforcement of site safety precautions. � <br /> 3.0-.PERSONAL PROTECTIVE EQUIPMENT_ ,r } <br /> L i <br /> Potential exposure to organic contaminants is associated with underground storage tank <br /> investigations and associated soil and groundwater saulpling. Al} personnel shall undertake the <br /> �. following precautions: <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.