My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tf- <br /> MEN <br /> r <br /> r <br /> INTERIM SOIL REMEDIATION WORK PLAN <br /> at <br /> ARCO Service Station No. 2076 <br /> 800 Kettleman Lane <br /> Lodi, California <br /> For ARCO Products Company <br /> INTRODUCTION <br /> request of ARCO Products Company(ARCO). Applied GeoSvstems, Inc./RESNA <br /> re <br /> At the q <br /> Industries (RESNA) is submitting this interim work plan for sail remediation at ARCO <br /> I California. T1te tank <br /> Service Station No. 2076, 500 East Kettlentan Lane it upgrade and is not it-, response <br /> ith <br /> replacement is planned in conjl]ecsite.n "\Vetare 0,sObmitting this work plan before ARCO <br /> � to a known spill or leak at t <br /> subcontractors upgrade the site to obtain authorization from the San Joaquin County Public <br /> su <br /> boon Services Environmental Health Division (SJCPHS-EI-ID), to install iu g ode <br /> H (VES). TI P P <br /> ill <br /> components that will later be used in the vapor extraction system { <br /> comp les collected during the <br /> be'snstalled during the tank removal if laboratory results of sot camp <br /> tank removal indicate soil remediation is warranted. <br /> 3OW8-3NV <br />
The URL can be used to link to this page
Your browser does not support the video tag.