Laserfiche WebLink
" rn <br /> OW NO <br /> 4 <br /> gI <br /> Work Plan September S, 1990 <br /> Arco Service Station 2076, Lodi, California AGS 30008-1W <br /> FIELD PROCEDURES <br /> nfe a <br /> The attached site safety plan (Applied GeoSystems, March 23, 1990) describes the basic <br /> safety requirements for the drilling of soil borings at the work site. The safety plan is <br /> applicable .to personnel of Applied GeoSystems and to subcontractors of Applied <br /> GeoSystems. The Applied GeoSystems geologist will be the Site Safety Officer. Personnel <br /> � j <br /> at the.site will be informed of the contents of the site safety plan before work begins. A <br /> copy of the plan will be kept at the work site and will be available for reference by <br /> appropriate parties during the work. <br /> r <br /> y <br /> Drill-n Prn edsires <br /> ,4 <br /> Before.drilling,we will acquire a permit from the SFPHS for drilling a inaxirntim of four soil <br /> i borings near the gasoline tank cavity. Applied.GeoSystems will contact Underground '. <br /> Service Alert at least 48 hours before drilling to delineate public utility lines at the site. <br /> i1,3 c <br /> r Before drilling,each borehole location will be hand-augered 3 to 5 feet below grade. <br /> The soil borings will be drilled using a truck-mounted rig equipped with 8-inch-diameter, <br /> continuous-flight. hollow-stem augers. The drilling will be performed under the guidance <br /> a` <br /> a <br /> v ti <br /> AjpIred Geoswwems <br />