My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ` z....a�,�; 4 .. ,. k �fa� P•".., s�.�u' �.. _ 0— ;,� nim a <br /> n Y res r � S f <br /> liyly +� <br /> I' <br /> 4 <br /> Work Plan September 5, 1990 <br /> Arco Service Station 2076, Lodi, California AGS 30008-1W <br /> If gasoline hydrocarbons in soil are detected in samples collected from these borings and <br /> the extent of the gasoline hydrocarbons is not defined within the scope of this work,with <br /> ARCO`s authorization, we will continue our investigation after the present tanks are <br /> r-- <br /> removed, Before continuing this investigation, a work plan discussing the drilling of soil <br /> borings and collecting and analyzing of soil samples to delineate gasoline hydrocarbons in <br /> soil will be submitted to the SJPHS. We will investigate ground water for gasoline <br /> hydrocarbons if warranted. <br /> If additional work is warranted,we will submit to the SJPHS either a status letter or a work <br /> � plan for further work to delineate gasoline hydrocarbons approximately <br /> 3 months after the. <br /> tank removal project is completed. Information gathered will be considered confidential and <br /> released only with the authorization of ARCO. <br /> r_ <br /> PROJECT PERSONNEL. <br /> Mr.John Bailey Bobbitt,a Registered Geologist(R.G.4313)in the State of California,will <br /> be in charge of the project. NIs.Eloise Frick,Project Geologist,will manage field and office <br /> =� operations. Applied GeoSysterns employs a staff of engineers, geologists, and technicians <br /> whose services wiii be used to see the project through to completion. <br /> s = <br /> AML <br /> �� 11 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.