Laserfiche WebLink
� ` z....a�,�; 4 .. ,. k �fa� P•".., s�.�u' �.. _ 0— ;,� nim a <br /> n Y res r � S f <br /> liyly +� <br /> I' <br /> 4 <br /> Work Plan September 5, 1990 <br /> Arco Service Station 2076, Lodi, California AGS 30008-1W <br /> If gasoline hydrocarbons in soil are detected in samples collected from these borings and <br /> the extent of the gasoline hydrocarbons is not defined within the scope of this work,with <br /> ARCO`s authorization, we will continue our investigation after the present tanks are <br /> r-- <br /> removed, Before continuing this investigation, a work plan discussing the drilling of soil <br /> borings and collecting and analyzing of soil samples to delineate gasoline hydrocarbons in <br /> soil will be submitted to the SJPHS. We will investigate ground water for gasoline <br /> hydrocarbons if warranted. <br /> If additional work is warranted,we will submit to the SJPHS either a status letter or a work <br /> � plan for further work to delineate gasoline hydrocarbons approximately <br /> 3 months after the. <br /> tank removal project is completed. Information gathered will be considered confidential and <br /> released only with the authorization of ARCO. <br /> r_ <br /> PROJECT PERSONNEL. <br /> Mr.John Bailey Bobbitt,a Registered Geologist(R.G.4313)in the State of California,will <br /> be in charge of the project. NIs.Eloise Frick,Project Geologist,will manage field and office <br /> =� operations. Applied GeoSysterns employs a staff of engineers, geologists, and technicians <br /> whose services wiii be used to see the project through to completion. <br /> s = <br /> AML <br /> �� 11 <br /> 1 <br />