My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:36:58 PM
Creation date
2/11/2020 4:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emcon, <br /> 1433 North Market Boulevard Sacramento,Colifomia 95$341943•`(916y9a"iJSW 1& Fax(916)928-3341 <br /> . 2 <br /> 4 <br /> 2 <br /> June 24, 1996 <br /> Project 0805-144.04 <br /> Ms. Mary Meays <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Ave, Third Floor <br /> Stockton, California 95201-0388 <br /> Re: !Extension Request for Calculations and Evaluation for ARCO Service Station <br /> No. 2076, Located at 800 Kettleman Lane, Lodi, California <br /> Dear Ms Meays: <br /> On behalf of ARCO Products Company (ARCO), EMCON is requesting an extension for <br /> preparation of petroleum hydrocarbon mass calculations and geologic conditions <br /> evaluation for ARCO Service Station No. 2076, located at 800 East Kettleman Lane, Lodi, <br /> California. The calculations and geologic evaluation are being performed to assess the <br /> degree of site characterization conducted to date, the vertical extent of petroleum <br /> hydrocarbon-impacted soil, and the influence of geologic conditions on the distribution of <br /> petroleum hydrocarbon'impacts. The original submittal date for this report was July 15, <br /> 1996. However, because of vacation plans, EMCON is requesting an extension to July 26, <br /> 1996. The extension will permit client review and input prior to report submittal. <br /> If you have any questions regarding this extension request, please call. <br /> Sincerely, <br /> EMCON <br /> Matt Turner 4Johnson, R.G. <br /> Project Manager enk)r Project Supervisor <br /> cc: Kyle Christie, ARCO Products Company <br /> SAC\N.\PJM805\1)8051440.4BS-96,pa.s:I <br />
The URL can be used to link to this page
Your browser does not support the video tag.