My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:36:58 PM
Creation date
2/11/2020 4:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KYLE CHRISTIE <br /> PAGE 2 <br /> 1711 E. Yosemite, Manteca ARCO Facility #6020 <br /> PHSIEHD contact - Michael Infurna <br /> The underground storage tanks at this facility are scheduled to be removed. The exact <br /> removal date has not yet been determined. The work will probably coincide with the street <br /> widening planned for Yosemite Street in Manteca. The tank closure plan, when submitted to <br /> PHS/EHD, will include a work plan to over-excavate the new tank pit area and to take <br /> 'confirmation soil samples. This corrective action requires an executive summary and a public <br /> participation period of I to 30 days prior to implementation. This site is to remain on an <br /> annual groundwater monitoring and sampling schedule. Upon review and concurrence with the <br /> tank closure report sent to both PHSIEHD and CVRWQCB, documenting successful <br /> remediation of the contaminated soil by over-excavation and destruction of the three monitoring <br /> wells, site certification/closure will be granted. <br /> 7906 N. El Dorado St., Stockton ARCO Facility #2130 <br /> PHSIEHD contact - Michael Infurna <br /> The addendum to the Final Remedial Plan has been received by PHS/EHD and is currently <br /> undergoing review_ <br /> The remedial system is currently on line as of last week. <br /> The additional monitoring wells will be installed pending access to the off site locations. <br /> Access agreements were mailed out last month. <br /> Several monitoring wells at the site need to be upgraded or maintained due to disrepair. This <br /> will be taken care of in the next quarter. <br /> 441 W. Charter Way, Stockton ARCO Facility #2168 <br /> PHSIEHD contact - Michael Infurna <br /> The addendum to the Final Remedial Plan has been received by PHSIEHD and is undergoing <br /> review. The current quarterly report has not yet been completed but the upgradient well is still <br /> showing the second highest levels of contamination. ; A historic search by ARCO on the use of <br /> the property to the west of the site to determine if there were any former underground storage <br /> tanks would be helpful. A file review report completed by EMCON will'be submitted to <br /> PHS/EHD. <br /> The underground storage tanks at this site are scheduled to be removed but <br /> the exact date and whether they will be replaced has not yet been determined and is <br /> dependent on a new lease agreement between ARCO and the property owner. <br /> The new legislation regarding commingling plumes was briefly discussed. S6108 requires a <br /> trial period with the City of Blythe but the legislation may be helpful to situations where there <br /> are documented co-mingling plumes. <br /> 800 E. Kettleman, Lodi ARCO Facility 2076 <br /> PHDIEHD contact - Mary Meays <br /> The unauthorized release report fled for this site in September 1994 for a drive off spill was <br /> discussed. The disposition of the absorbent and the contaminated soil from the cleanup will be <br /> included in the next quarterly report or in a separate letter. The third quarter status report was <br /> received at the meeting. ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.