My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:36:58 PM
Creation date
2/11/2020 4:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KYLE CHRISTIE <br /> PAGE 5 <br /> i <br /> current data from the area of monitoring well MV\/#2, ARCO would like to postpone the confirmation <br /> drilling until such a time that the other site data indicate it t6 be warranted. PHS/EHD agreed that this <br /> was a more cost effective approach. The San Joaqiun Valley Unified Air Pollution Control District has <br /> approved the biofiiter for use in place of the Catalytic converter. A new blower has been purchased to <br /> allow remediation to continue at the site once the catalytic converter is moved to ARCO station #2093 <br /> in Tracy. <br /> The environmental assessment conducted across Kettleman i Lane at 514 Kettleman Lane has been <br /> completed with the installation of two monitoring wells. The ',report has not yet been submitted but <br /> preliminary results indicate no contamination in the soil or the groundwater. The report should be <br /> submitted soon and will be available for public review. „ 4 <br /> Summary <br /> The meeting allowed for continued communication between all parties and for <br /> continued progress at the sites. The next meetings`to discuss site progress was <br /> scheduled tentatively for February 14, 1994 at 10:00 AM at the office of PHS/EHD. <br /> If you disagree.with this summary of the November 14, 1994 meeting or have any <br /> questions, please contact me at (249) 468-3452. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> M <br /> I <br /> F i <br /> Diane M. Hinson, REHS <br /> Supervisor <br /> c: Elizabeth Thayer, CVRWQCB c: Jay Johnson, EMCON <br /> c: Ron Zuriinden, B&C c: Steve Meisner, B&C <br /> f <br /> { <br /> r <br /> f <br /> I <br /> 4 <br /> I I <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.