Laserfiche WebLink
n n: <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Donna K. Heran, R.E.H.S. Unit Supervisors <br /> 1, + 304 East Weber Avenue,Third Floor Car]Bman,R.E.H.S. <br /> Director Borg <br /> man, <br /> Olsen, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> • c:w a:'P Program Manager Telephone: (209)468-3420 Douglas W. Wilson, R.E.H.S. <br /> 4LiFyQ v <br /> Laurie A. Cotulla, R.E.H.S. Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) ,464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehcl/ Jeff Carruesco,R.E.H.S. <br /> PETE GRAFFIGNA <br /> FLAME MINI-MART <br /> 1301 W KETTLEMAN LANE <br /> LODI CA 95242 <br /> RE: FLAME MINI-MART SITE CODE: 1342 <br /> 1301 W KETTLEMAN LANE <br /> LODI CA 95242 <br /> WORKPLAN: REVISED SITE ASSESSMENT ADDENDUM <br /> DATED: JUNE 24, 2005 <br /> PREPARED BY: AGE <br /> APPROVED: [X] <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORk PLAN [H&S 25296.10 (c)(3)]: <br /> 1. To perform batch groundwater extraction from MW-2. EHD's approval is for two events, two <br /> months apart. <br /> 2. To install one ozone sparge well and perform a zone sparge pilot test. <br /> 3. To install 3 additional on-site shallow monitoring Wells. <br /> 4. To install 4 additional soil borings to 70 feet bgs in the area of the former USTs and dispenser <br /> island to determine if high concentrations of sorbed contaminants are present. If high levels <br /> of soil contamination exists and soil remediation lis warranted, vapor extraction well installation <br /> will be considered utilizing the open borings. <br /> 5. To collect soil samples from the borings and groundwater samples from MWs for analysis: <br /> TPH-gas, BTEX, and fuel additives including MTBE. <br /> 6. To prepare a report of findings including the results of the batch groundwater extraction pump <br /> test and the ozone pilot test. <br /> COMMENTS AND CONDITIONS: <br /> 1. All required permits must be procured prior to be work. <br /> 2. The report of finding must be prepared and submitted to EHD and CVRWQCB by November <br /> 15, 2005. <br /> 3. EHD, in a letter dated May 17, 2005, previously approved batch groundwater removal, <br /> installation of 3 MWs, installation of an ozone well, and ozone pilot testing. <br /> DATE I 0 BY ^'` - " <br /> Harlin Knoll, Senior REHS (209)468-3442 <br /> Cc AGE <br />