My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003066
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
3500 - Local Oversight Program
>
PR0545342
>
ARCHIVED REPORTS_XR0003066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 3:48:42 PM
Creation date
2/12/2020 8:56:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003066
RECORD_ID
PR0545342
PE
3528
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
02
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 28 February 2005 <br /> AGE-NC Project No 99-0624 <br /> Page 12 of 12 <br /> • pH by EPA method 150 1, <br /> • Conductivity by EPA method 120 1, <br /> • General minerals including boron, calcium, iron, manganese, magnesium, sodium, and <br /> potassium in accordance with EPA Method 200 7, <br /> • Total Alkalinity by EPA Method 2320B, <br /> • Metals by EPA Method 200 8, and <br /> • Chromium VI by EPA Method 218 6 <br /> Laboratory reports for ground water analysis, testing methods, laboratory QA/QC reports, and <br /> sample chain of custody documentation will be presented in a report with findings and <br /> recommendations <br /> 5 5 BATCH GROUND WATER REMOVAL <br /> wAGE proposes to extract petroleum-impacted ground water from the most impacted well MW-2 into <br /> a holding tank (batch removal) on a monthly basis until startup of the ozone spargmg system The <br /> 10,000-gallon Baker holding tank will be placed temporarily in the car-parking area at the southwest <br /> corner of the Flame Mini-Mart building each time it is to be utilized, when filled, the tank will be <br /> placed on a flat-bed truck and transported to a state-certified disposal site, where the impacted <br /> ground water will be disposed <br /> Petroleum-impacted ground water will be extracted from well MW-2 utilizing a submersible <br /> Grundfos Redi-flo pump,at a pumping rate of between 1 5 to 3 gallons per minute (gpm) One-inch <br /> diameter surface tubing will connect the pump to the Baker tank Ground water samples will be <br /> collected at regular intervals to determine the volume of contaminates removed during the extraction <br /> process The samples will be analyzed for the constituents listed in Section 4 2 <br /> 5 6 EQUIPMENT DECONTAMINATION <br /> All sampling tools used for sample collection will be thoroughly washed with a solution of Alconox <br /> and rinsed with clean water prior to use at each sampling location Hollow-stem augers will be <br /> steam-cleaned prior to advancing each pilot boring <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.